Converts low-power wired network to the self-contained cable of the town of Torq
October 8, 2017
Construction of 20 kV network and installation of 50 kV transformer to supply electrical power to the Abkhod village
October 8, 2017

May 23, 2013
Project Type: Transmission (High Pressure)

Further information
Project Manager: Mohsen Ahmadi
Location: Mashhad
Client: Mashhad Power Distribution

 
hacklink hack forum hacklink film izle w88 link moi nhatz library download books b-ok 1lib projectdeneme bonusu veren siteler메이저놀이터deneme bonusu veren sitelergalabet girişfatih escortbetciograndpashatipobetКазино с минимальным депозитом1xbet girişcasibomturkbetmarsbahispusulabetwbahiscasibomromabetjojobetmarsbahiscasibomcasibombetwoonatlasbetdeneme bonusu veren sitelersahabetmatbet girişartemisbetgalabetcasibomvegabetonwincasino sitelerisweet bonanzadeneme bonusugrandpashabetcasibomdeneme bonusu veren siteleraviatorgüvenilir bahis sitelerigrandpashabetpalacebetslot sitelerinitrobahispalacebetcasibomcasibomcasibomnoktabetCasibomsekabetQueenbet Güncel Girişmegabahisartemisbetkavbetmavibetnakitbahislunabetbets10ultrabet