October 10, 2017

Solar Cell Installation in Mashhad tram line substation

October 10, 2017

20KV cabling from Torogh substation to Mashhad tram line No.1 SWS

October 10, 2017

Electrical and construction works for building and street lighting of Birjand University

October 10, 2017

Maintenance of Farshchi , Resalat, Khatam- Al- Anbia centers

October 9, 2017

110 kV distribution network and transmission line of the Qala-e-Naw of Afghanistan

   
October 8, 2017

Providing electrical grid for remote villages in Iranshahr, Delgan, Nikshahr, Sarbaz and Chabahar

October 8, 2017

20KV double circuit network for Chahak substation

October 8, 2017

Cabling and installation of cable junctions and cable heads for 132KV connection of Bouali to Sepad substations

October 8, 2017

Maintenance of the overhead network for district 3 of Mashhad

October 8, 2017

erection and installation of 10Km-long 132KV connection line of AbuTalib 400KV substation

October 8, 2017

Optimization operation for a section of 63KV double circuit transmission line of Pardis to Lar dam

October 8, 2017

Cleaning of overhead insulators for transmission line and super distribution lines 230KV and 63 KV

October 8, 2017

20KV double circuit network of Binalood

October 8, 2017

Dormian and Haftadrood electric grid (water well electricity)

August 2, 2022

reparation of the foundation transmission line of Razavi Khorasan province

July 23, 2022

cabling 33 kv

  project name : construction132/20kv power substation esfarayen industrial town <br> start date : 2019/05/08 <br> further information <br> project manager : amir morrasaei <br> client […]
July 20, 2022

construction132/20kv power substation esfarayen industrial town

  project name : construction132/20kv power substation esfarayen industrial town <br> start date : 2019/05/08 <br> further information <br> project manager : amir morrasaei <br> client […]
June 30, 2020

20kW private solar power system

June 30, 2020

20kW on grid solar power system of Mashhad passenger terminal network

June 30, 2020

20kW on grid solar power system of Khorasan Razavi Inspection Organization

June 30, 2020

20kW on grid solar power system of Faraiman liquefied petroleum gas company

June 30, 2020

250kW on grid solar power system of Khorasan Regional Electricity Company

June 30, 2020

2.5kW on grid solar power system connected to the single axis tracker network of Kermanshah Proske Company

June 30, 2020

20kW on grid solar power system of the Ministry of Energy’s Higher Education Complex

June 30, 2020

20KW solar power plant of Khorasan Oil Distribution and Refining Company

August 22, 2019

Repair and overhaul of the Kabul northwest power station by the cooperation of Breshna Sherkat and Atlas Afrooz Company

Atlas Afrooz Shargh Co., with specialized capabilities and over a decade of technical experience in the field of electricity industry, is working with the renowned Afghan […]
August 22, 2019

Iran increases electricity export to Afghanistan

The ministry of energy announced the long-term sale of electricity by increasing exports to Afghanistan, saying Iran would eliminate power plants energy loss in Afghanistan and […]
December 11, 2017

MV injection network for a 260KW solar plant

October 10, 2017

Purchase and assembly of towers and equipment and stringing of 63 KV line of Zahedan – Mohammad Abdul Kourin

October 10, 2017

earthing system and stub, and complete execution of 400KV line Shadmehr-Torbat-e-Jam (second Lot)

October 10, 2017

400KV Double circuit line Shahid Rajaee-Dasht-e-Abi

October 10, 2017

Tower erection and wiring of the 63 KV Line of Remin – Chabahar

October 10, 2017

Installation of a 63 kw barbell wire line in Chabahar

October 10, 2017

The disassembly of 63KV cable line in the ground ,132/20KV substation,Mashhad power plant

October 10, 2017

Installation of the connection between Abotaleb and Sepad substations

October 10, 2017

Fixing the problems of 63 KV Qom 2-Salafchegan line

October 10, 2017

disassembly of 63KV cable line of 132/20KV substation,Mashhad power plant

October 10, 2017

Fixing some of the problems of 230 KV line between Montazer-Ghaem and Kamal-Abad

October 10, 2017

Sorting and grouping of 800 tons of ironware in warehouse 94 and the Azadegan substation warehouse

October 10, 2017

Equipment purchase and execution of guard wire for 132KV Ashkanan-Lamerd line

October 10, 2017

Rerouting of 63KV connection line between Shariati powerstation to Rezaieh substation

October 10, 2017

wash and cleanse of insulators of transmission and distribution lines ,Tehran

October 10, 2017

Operational optimization part of the 63 kilowatt two-circuit campus line

October 10, 2017

Supply and delivery of 240 kilowatts of solar power plant

October 10, 2017

Installation of cable support and 230 KV cabling of Azadegan-Qurkhaneh cables

October 10, 2017

Repair and maintenance of water ,sewage,and gas networks and office buildings of refinery

October 10, 2017

Pavilion of the platform and construction of the prayer hall of Nasrabad railway station

October 10, 2017

The construction of 500m²- type special clinic in Golbahar

October 10, 2017

Development and repair of technical buildings of Qom station

October 10, 2017

Construction of a two-wire 63-kV Azadegan cable – a chicken castle in length of 7.5 kilometers

October 10, 2017

Construction and installation of metal skeleton, construction of roof and shear wall of 80 unit project

October 10, 2017

Optical fiber channel channeling operation of Saleh Abad Torbat Jam

October 10, 2017

Destruction and rehabilitation of non-standard schools and rehabilitation of schools without solidity

October 10, 2017

Operator of telephone centers for home and disposables and wireless departments of Hormozgan

October 10, 2017

Management and Support Services and Support Services of Birjand University

October 10, 2017

Services for maintenance of equipment for IOC and GSC centers, RTU stations and dispatcher areas

October 10, 2017

Maintenance and repair of electrical mechanics and instrumentation, and related work and guidance of the workshop

October 10, 2017

Moving the personnel of the Water Utilization Department Unit of Occurrence

October 10, 2017

Preparing, cooking and distributing food at Kermanshah Oil Refining Company

October 10, 2017

Lighting cabling at Motahari Station

October 10, 2017

Implementation of the project to complete the lighting of Chromshahr industrial towns, Phase 2 Binalood and Torbat Jam

October 10, 2017

Implementation of Sina’s Electricity Area Transit Optimization Plan

October 10, 2017

Maintenance and operation of lighting networks in the Sina Electricity Zone

October 10, 2017

Lighting Improvement Project in Farabi Electric Power Distribution Zone

October 10, 2017

Implementation of the 20 kV network project of Torbat Heydarieh Industrial Town 2

October 10, 2017

Construction and installation of 9 lighting equipment with cabling, poding and manufacturing of manholes in the area of the border of the Docharoon

October 10, 2017

Maintenance and operation of lighting networks in Farabi Power Districts

October 10, 2017

Cabling operation at Vali Asr Sarakhs Telephone Center

October 10, 2017

Optical fiber channel channeling operation of Saleh Abad Torbat Jam

October 10, 2017

Installing Optical Cuffs in Dargus Telecom

October 10, 2017

Construction of a 20 kV power supply network for the Abkhad village telecommunications site

October 10, 2017

Transmission of power, installation and commissioning of power grids in Sinai and Suhrawardi districts

October 9, 2017

Completion of the 20 kilowatt network of Industrial Town Machine Building

October 9, 2017

The 20 kilowatt line of Nirvshany pipeline to the pumping stations of the Second Development Zone of Khadavarrin

October 9, 2017

Displacement of 20 kilowatt feeders with development of mine complex of Babak Mine complex

October 9, 2017

Electricity to the villages of Mortan and Parad. sarbaz

October 8, 2017

The implementation of the medium pressure network from the 132 kw post hail to the Mashhad Garrison

October 8, 2017

Electricity operation to the villages without electricity in the cities of Zahedan, Mir-Java, Khash, Saravan, Apples and Soran

October 8, 2017

Transfer of electricity project to irregular villages in Iranshahr Darghan

October 8, 2017

Transfer of electricity project to unhealthy villages in Zahedan, Khash Mirawa

October 8, 2017

Supply of equipment and operation for the construction of a complete 20 kV line of Zahedan Solar Power Plant

October 8, 2017

Supply of equipment and operation for the construction of a full 20 kilowatt line of the Jarqvia Solar Power Plant

October 8, 2017

Improvement and Optimization of Rural Networks of Mashhad, Torqabeh and Shandiz

October 8, 2017

Electricity to the villages without electricity Sardasht Dezfoul Phase 4

October 8, 2017

Electrification to the villages of Sarbishe County

October 8, 2017

Electricity to the villages without electricity Sardasht Dezfoul Phase 3

October 8, 2017

Equipment, drilling and cabling to increase the capacity of high voltage power stations of Behshahr Industrial Co.

October 8, 2017

Supply and supply of goods and equipment needed to supply electricity to the villages of Darmian and Qaynat

October 8, 2017

Campus Building Design Plan for Gonabad University of Medical Sciences and Health Services

October 8, 2017

Power Supply Station Recycling

October 8, 2017

Execution of Power Supply Project for Service Phase of Toos Industrial Town

October 8, 2017

Equipment, drilling and cabling to increase the capacity of high voltage power stations of Behshahr Industrial Co.

October 8, 2017

Complete the power supply to the village of Zoshk

October 8, 2017

Maintenance and operation of lighting networks in the Sina Electricity Zone

October 8, 2017

Electrification to Golbahar Mehr Housing

October 8, 2017

Transition of the intermediate strain gauge pressure switch

October 8, 2017

Supply of equipment and implementation of the project for the installation and installation of 2 air mail 250

October 8, 2017

Branches of Electrical Posts Heidarian Sports Complex

October 8, 2017

Preparation and implementation of medium voltage power grid of Novozaran project (Shahrzad)

October 8, 2017

Preparation and implementation of intermediate power supply network for blocks 7 and 8 and sports hall of Novozaran project

October 8, 2017

Preparation and implementation of low voltage power network of Novozaran 10 (Behrooz)

October 8, 2017

Construction of 20 kV network and installation of trans and light paths in Shandiz from the end of the project area to the fish pool

October 8, 2017

Preparation and implementation of low voltage power network for blocks 7 and 8 and sports hall of Novozaran project

October 8, 2017

Supply of electricity for residential buildings in Targhabeh and Shandiz (Ladies Shandiz)

October 8, 2017

Modify the network and replace the aerial network with the ground in the development of Couch Park

October 8, 2017

Construction of 20 kV network and installation of 50 kV transformer to supply electrical power to the Abkhod village

October 8, 2017

Converts low-power wired network to unconnected ten cable

October 8, 2017

Converts low-power wired network to the self-contained cable of the town of Torq

October 8, 2017

Water supply to drinking water wells

October 8, 2017

Converts Low Voltage Wired Power Cable to Self-contained Cable in Power Range

October 8, 2017

Converts the low-power wired network to the self-supporting cable of the village of Hills Hill and the dashboard

October 8, 2017

Electrification to the great Khorasan Museum

October 8, 2017

20KV cabling of double circuit network, Saghravan substation

October 8, 2017

Firewall cabling operation and Fiber Optic Interconnecting Azadegan Mashhad Telephone Center

October 8, 2017

Executable Operations: Connecting the Campus-Khawja Rabih-e-Pun Post Offices to Post Abu Talib

October 8, 2017

Provision and installation of a Gentry device and installation operations at Rezundan Post

October 8, 2017

Fiber Optic Wiring Operations Route Line 132KV Post 400KV Birjand-Baqran

October 8, 2017

Implementation of Mount-Sole Power Station

October 8, 2017

Grid kv 20 Supply of Mine Gezik

October 8, 2017

Chenaran Industrial Complex Operations

October 8, 2017

Power supply to Rezvan 2

October 8, 2017

Power to the post office

October 8, 2017

Execution of moderate pressure network plus complete switching equipment

October 4, 2017

General Services

General Services Due to years of experience in providing general services, Atlas Afrooz Co. represents services in fields such as supplying welfare centers, restaurants and human […]
hacklink al duÅŸakabin fiyatları fethiye escort bayan escort - vip elit escort dizi film izle erotik film izle duÅŸakabin hack forum casibom marsbahis marsbahisgirtr marsbahis matadorbet casibom starzbet casibombet10betvozol 10000 puffJojobetDeneme Bonusu Veren Siteler国产线播放å…费人æˆè§†é¢‘播放casibomå…费女åŒæ€§æ‹è§†é¢‘betvinojojobetonwinsekabet giriÅŸxslotcasino seoparibahisganobetganobetjojobetdumanbetjojobetMarsbahis GiriÅŸjojobetjojobettümbet casino giriÅŸpusulabetbettiltdinamobetcasibomcasibomgalabetjojobetcasibomkavbettipobetlunabetonwinsahabetmatadorbettipobetonwin giriÅŸmatadorbet giriÅŸsahabet giriÅŸstarzbetbetpublicsüpertotobetfixbetxslotbetmatikbetkommariobettarafbetbahiscom1xbetgrandpashabetgrandpashabet twitterbets10onwinbetkanyon twittertruvabettumbetcasibomtümbetbettiltbaywinjojobettümbetbayspinxslot